When Manchester United / NIKE decided to refurb the Megastore IP Communications were delighted to be approached to complete these works.
The Project had two phases and needed completion within three weeks with the majority of the work taking place out of normal working hours.
Phase 1
To remove all UTP cables from affected areas ensuring there was no disruption to service to the Temporarily Megasore. Ensure all existing had required length and tested to Industry standards
Phase 2
Install additional category 5 enhanced network points as per revised drawings. Over a two night period working with other trades ensure all cabling was complete to point, terminated and tested. Ensuring handover to Client prior to
9.00am opening.